PPAPElement 8
PPAP Element 8: What Has to Be Covered Besides the Gauge R&R Report?
A single Gauge R&R report attached to Element 8 flips the element's status to submitted, but that is not the same as every special characteristic on the part having a defensible measurement system behind it. Here is what Element 8 actually has to cover under AIAG PPAP 4th Edition and IATF 16949 Clause 7.1.5.1.1, why a package can look complete and still leave a critical gauge unqualified, and how QualityEngineer.ai tracks MSA coverage characteristic by characteristic instead of element by element.
August 12, 202611 min read