PPAP Submission Management Software
A PPAP package goes back when the links between its documents break. See the missing links before your customer does.
Assemble PPAP packages with an element-by-element checklist for your submission level. Control Plans, PFMEAs, Process Flows, and Inspection Plans generated in Build link onto their PPAP elements when the package is created from a part, and each keeps the record of the documents it was built from. The package checks flag missing elements, unattached documents, and missing links between process steps, failure modes, controls, and capability studies, then you export a zip with the Part Submission Warrant or share the package with your customer.
Cross-check
A gauge with no study behind it, flagged on Element 8 before the package goes out.
Completeness is computed from a traceability graph of the package, with no AI model. It is the share of required links that are present: each special characteristic to a control plan line and a capability study, each process step to a PFMEA failure mode, each failure mode to a control plan mitigation, each characteristic to a dimensional result when your level submits Element 9, and a Ppk of at least 1.33 on capability studies when your level submits Element 11.
The MSA coverage check below is an advisory on Element 8 and does not change completeness. The quality score, out of 100, is a separate number and is never averaged with completeness.
- Op
- 20, finish bore
- Characteristic
- Bearing bore diameterSC, special characteristic
- Spec
- 62.000 +0.030 / 0 mm
- Method
- CMM, 1 per 50
- Gauge
- G-117
- Characteristic
- Bearing bore diameterSC, special characteristic
- Gauge
- G-117
- MSA study
- None attached
- Status
- Missing, advisory
FLAGNo MSA study is attached for gauge G-117.
Where it shows
Element 8 of the PPAP request, as an advisory
Attach a study
A Gauge R&R run on G-117, attached to Element 8
Or record a waiver
A reason is required, and the row reads waived
Capabilities
What Package does
18-Element Checklist
Track all 18 PPAP elements with a status on each element, the linked document, and reviewer feedback, plus one due date for the whole submission.
Build IntegrationCore
Control Plans, PFMEAs, Process Flows, and Inspection Plans generated in Build link onto the matching PPAP elements when the package is created from a part, or when you sync part data. Each document keeps the record of the documents it was built from, viewable in Build.
Cross-Document ValidationCore
Checks that every process step has a PFMEA failure mode, every failure mode has a control plan mitigation, and every special characteristic has a control plan line and a capability study. Missing links are listed as findings, with gaps on critical characteristics first.
PSW Generation
Generate a Part Submission Warrant with the part header, supplier, submission level, and each element's disposition filled in from your package, then add the reason, signature, and certification.
Gap Analysis
Flags required elements that are missing or rejected, submitted elements with no document behind them, and elements with open review findings, for the elements your submission level requires.
Export and Share
Export a complete package as a zip archive with a cover sheet and Part Submission Warrant PDF at the front, or share it with your customer through the customer portal.
Who does what
PPAP packaging: the software prepares, an engineer decides.
Prepared by the software
- Checks every element your submission level requires and flags missing elements, rejected elements, and submitted elements with no document behind them
- Computes completeness from the package traceability graph, with no AI model, as the share of required links present between characteristics, control plan lines, capability studies, dimensional results, process steps, and failure modes
- Checks capability studies against a 1.33 Ppk floor when your level submits Element 11, and flags a study that reports Cpk but no Ppk for review
- Shows on Element 8 whether each gauge has an MSA study attached, as an advisory that does not change completeness
- Reports a quality score out of 100 as a separate number from completeness, with the missing links and suggested fixes listed
- Checks, in an AI evaluation you run, that operation numbers line up across the Process Flow, PFMEA, and Control Plan
Decided by an engineer
- Approves or rejects each document change the software proposes from a corrective action or an engineering change, before it is applied
- Approves, rejects, or waives each PPAP element, and approves or rejects the submission
- Approves NCR dispositions and signs off each corrective action
- Signs control plans, PFMEAs, and other title-block documents by role, and enters the authorized signature on the warrant
Signed in the app: typed signature, name, date
Workflow
How it works
- 01Select part and level
- 02Assemble documents
- 03Run the package checks
- 04Resolve flagged items
- 05Export the zip or share with your customer
Use cases
Built for PPAP submission teams
- Supplier quality engineers assembling PPAP packages for customer submission
- APQP program managers tracking PPAP element completion per part and per request, with a due date on each submission
- Tier 1 suppliers managing Level 3 and Level 5 submissions across industries
- Quality teams checking the links between process flow, PFMEA, control plan, and capability studies before customer review
- New product launch teams managing multiple concurrent PPAP timelines
- Supplier development engineers reviewing incoming PPAP packages from sub-tier suppliers
Questions
Frequently asked questions
What are the 18 PPAP elements?
How does QualityEngineer.ai validate a PPAP package?
What PPAP submission levels does the platform support?
Can suppliers upload documents through a portal?
How does this integrate with the rest of the quality workflow?