PPAPPPAP Levels
PPAP Submission Levels 1 Through 5: What Each Level Requires and How Your Customer Decides Which One You Submit
A practitioner walkthrough of the five PPAP submission levels in the AIAG PPAP 4th Edition. What Level 1 through Level 5 each require you to submit versus retain, why Level 3 is the default, how the customer designates the level, what a significant production run has to look like, and how to read the Submission and Retention Requirements table so your package matches what the SQE actually asked for.
July 19, 202612 min read